Friday, March 14, 2008

Day Three of Renovation




Today the whirlpool tub was installed. Have to let it set as it is glued down and something with the pipes...???...forget. They also put down some kind of flooring to have it ready to tile. Anyway, they will be back on Monday to start again. Went to Home Depot and picked up the paint for the bathroom. It's called Valley Mist by Behr and matches the glass tiles that will be installed in the tub area. Have to talk to Juan about which direction he wants the hand rail that will be installed above the tub. So things are coming along.

No comments: